LLC «SNEMA-Service»
Leading engineer
Experience - 15 years 6 months
Working on a shift basis in Tobolsk, on the construction of the Zapsibneftekhim plant, pyrolysis installation.
I performed work:
- organization and conduct of preparatory work in accordance with the requirements of procedures (check of technological systems for patency and leak tests, acceptance of energy resources, inertization of technological systems, etc.);
-carrying out works on complex testing of technological systems for tightness, complex testing of production on working environments;
- output of the technological process to a stable technological mode in accordance with the project requirements
Working on a shift basis in Tobolsk, on the construction of the Zapsibneftekhim plant, pyrolysis installation.
I performed work:
- organization and conduct of preparatory work in accordance with the requirements of procedures (check of technological systems for patency and leak tests, acceptance of energy resources, inertization of technological systems, etc.);
-carrying out works on complex testing of technological systems for tightness, complex testing of production on working environments;
- output of the technological process to a stable technological mode in accordance with the project requirements
Август 2016 —
январь 2020
январь 2020
3 года 5 месяцев
LLC "ZabSibNeftekhim"
Lead Engineer
2 years 8 months Tobolsk, Sibur.ru
-------
I worked commissioning works of a pyrolysis unit with a capacity of 1.5 million tons of ethylene per year, according to a project of Linde AG, At the beginning of the project, since there was no main work, the employer brought me in control of a contractor who was performing fire protection of metal structures with PITT-CHAR material. I controlled the observance of technological processes: control of the thickness of the applied primer coating, control of adhesion of the subsequent layers of fire retardant material, compliance with the temperature regime. I was involve in this work for 6 months.
Subsequently, the employer invited me to perform work on the input control of materials entering the construction site. I controlled the pipes, fittings for compliance with ASME and ANSI standards. I was involve in this work for 4 months.
Else ,I was to business trip the construction of "YMAL LNG" in the company "South Tambey LNG". Together with the contractor "Halliburton" and "Velesstroy
-------
I worked commissioning works of a pyrolysis unit with a capacity of 1.5 million tons of ethylene per year, according to a project of Linde AG, At the beginning of the project, since there was no main work, the employer brought me in control of a contractor who was performing fire protection of metal structures with PITT-CHAR material. I controlled the observance of technological processes: control of the thickness of the applied primer coating, control of adhesion of the subsequent layers of fire retardant material, compliance with the temperature regime. I was involve in this work for 6 months.
Subsequently, the employer invited me to perform work on the input control of materials entering the construction site. I controlled the pipes, fittings for compliance with ASME and ANSI standards. I was involve in this work for 4 months.
Else ,I was to business trip the construction of "YMAL LNG" in the company "South Tambey LNG". Together with the contractor "Halliburton" and "Velesstroy
Образование высшее
2000
Ufa State Aviation Technical University
Faculty of Automated Technological Systems, Equipment and technology for welding production
Знание языков
Русский — родной
Иностранные языки
Английский — A1 — Начальный
Гражданство, время в пути до работы
- Гражданство:Нет